From Cars to Crews: The Evolution of Construction Scheduling

Fall 2012 by the Team at CPMI Over the years, numerous construction tools and scheduling methods have emerged as a means to solve construction challenges. Location-based scheduling (LBS) is one of the latest methods that promise to increase efficiency. It is causing...

From Cars to Crews: The Evolution of Construction Scheduling

From Cars to Crews: The Evolution of Construction Scheduling A Look at LBS Over the years, numerous construction tools and scheduling methods have emerged as a means to solve construction challenges. Location-based scheduling (LBS) is one of the latest methods that...

Under Construction – Can There Be Float on the Critical Path?

August 2010 by Robert M. D’Onofrio (CPMI) Historically, activities with zero float were defined as the critical path. This is not always the case, however. Critical path activities can have float; hence the critical path can have float. This article dispels a common...