Home / Team / Ryan S. Clark, PE, CWI, LEED AP

Ryan S. Clark, PE, CWI, LEED AP

Ryan S. Clark, PE, CWI, LEED AP

Senior Manager

Ryan Clark provides claim evaluation and development services for dispute resolution in complex construction disputes. Ryan has more than 18 years of experience in the construction and manufacturing industries. Ryan specializes in analyzing construction claims, performing CPM scheduling, developing graphics and reports for understanding construction disputes, performing project cost analyses, reviewing and preparing delay and inefficiency claims, and providing litigation support.

Ryan has experience in quality control, quality assurance, and construction management on major federal government projects. His experience includes five years with the U.S. Army Corps of Engineers, where he was assigned to the Construction Division and performed quality assurance services for major U.S. military construction projects in South Korea. Ryan has also served as a project engineer supporting the federal government’s Hurricane Sandy recovery and clean-up efforts in the Northeast.

Education

Lehigh University, MBA

Yonsei University (Seoul, S. Korea), M.Sc.Eng., Civil Engineering

Lafayette College, B.S., Civil Engineering

Lafayette College, B.A., International Studies

Licenses/Credentials

Professional Engineer: Oregon

Certified Welding Inspector from American Welding Society

LEED AP BD+C

Select Speaking Engagements

“Recent Trends in Delay Claims and Damages Analysis,” Panel discussion for the 9th Annual Federal Government Contracting Seminar, Fairfax, VA, 2025.

“Schedule Delay Seminar: CPM Scheduling, Tactics, Delays, and Time Extensions,” Performed for a Pennsylvania Contractor, Malvern, PA, 2025.

“Schedule Delay Analysis: The Intermediary Method,” AACEi Conference Atlanta, GA, June 2024.

“Project Scheduling,” Villanova University Guest Lecturer; Villanova, PA, September 2022

“Quality Management, Scheduling, and Claims,” Lafayette College Guest Lecturer; Easton, PA, April 2021.

“Scheduling Tactics, Delays and Time Extensions“, Associated Builders and Contractors of Eastern Pennsylvania, Webinar, April 2020; Allentown, PA, March 2020.

“Welding Inspection Technology,” Training Course, Blue Bell, PA May 2020.

Select Testimony

Fluence Energy, LLC v. B&P, Inc., American Arbitration Association.

Project Highlights

Brewery Expansion Project – Analyzed delay on of five new, state-of-the-art packaging lines on a brewery expansion project to increase capacity to 20 million hectoliters of packaged beer annually, making it one of the largest in the world.  The contract value was over $250 million.  Assisted in writing deposition questions, performed a site visit, and lead meetings with senior stakeholders to establish a delay position.  Engaged leading fact witnesses to develop detailed timelines of events and corroborated all facts with project documents. End work product involved a series of comprehensive graphics integrated with an extensive report which was used as a road-map to a successful settlement.

Crankshaft Press Foundation – Analyzed the delay associated with a new, highly complex $9 million crankshaft press foundation.  Evaluated delay and alleged damages levied against the client.  Reviewed the schedules and created powerful graphics with an accompanying report which detailed the root cause of the delays.  Assisted the client during mediation of the claim which ultimately led to a successful settlement.

High Rise Modular Hotel – Evaluated cost increases associated with the construction of a unique, 23-story modular hotel with 210 modules.  Reviewed and analyzed scope growth and associated hard and soft construction costs to determine areas of budget overruns.  Root causes of overruns were determined based on a full review of project documents to include, but not limited to: financial statements, plans and specs, meeting minutes, and contractor cost reports.  Results discovered through an extensive analysis were developed into graphics and presented as a detailed report of findings complete with recommendations to assist the client in making more accurate budget projects and avoid overruns on future projects.

Mid-Rise Condominium – Performed reviews of periodic schedule updates of a $100 million mid-rise luxury apartment complex in New York City.  Performed site walks with the client to verify the state of construction to assist in billings and verifying schedule accuracy.  Discrepancies were noted both during site walks and in reviewing the technical makeup of the schedule (logic ties, proper updating, critical path verification, review of delay issues, missing activities, etc.).  Provided the client with a full list of comments that could be reviewed and forwarded to the contractor for action.