Siddharth Chodavarapu, PMP, PSP

Siddharth Chodavarapu, PMP, PSP

Senior Consultant

Siddharth provides claim evaluation and development services for dispute resolution in complex construction disputes. Siddharth specializes in forensic schedule delay, disruption, and loss of productivity analyses, and the planning and development of CPM schedules and project controls. Siddharth’s experience spans a broad portfolio of projects in the public and private sectors, including critical infrastructure such as power and water treatment plants, heavy civil projects involving highway, roadway, bridge and rail construction, and institutional developments such as healthcare and educational facilities.

Siddharth has also provided project controls and on-site construction management services for a general contractor. His work included the development and maintenance of CPM schedules, construction progress monitoring and oversight, subcontractor and vendor coordination, and submittal and RFI management for an eco-tourism development project and a large multipurpose commercial complex. Siddharth’s experience also includes structural and seismic analysis and design, as well as structural rehabilitation projects.

Education

The University of Texas at Austin, M.S., Civil Engineering, with a concentration in Construction Engineering and Project Management

University College of Engineering, Osmania University, India, B.E., Civil Engineering

Licenses/Credentials

AACE International, Planning and Scheduling Professional (PSP)

PMI, Project Management Professional (PMP)

Professional Affiliations

Association for the Advancement of Cost Engineering International (AACE) – Secretary, Delaware Valley Section

Project Management Institute (PMI)

Select Speaking Engagements

“Cost Loading of CPM Schedules in Primavera P6,” AACEI Delaware Valley Section, December 2024.

“A Deep Dive into Construction Scheduling: Cost Loading in Primavera P6,” AACEI Boston Section, October 2023.

Project Highlights

Bridge Construction Project: Evaluated $7 million in delay claims on behalf of a federal agency for a bridge construction project. Performed a comprehensive delay analysis and reviewed project records to assess delay causation and apportionment.  Identified over 200 days of concurrent contractor-caused delay involving precast concrete procurement, repairs, and installation, and an additional 50 days involving paving and concrete pours.  Assisted with affirmative and rebuttal expert reports, and supported discovery, fact and expert witness depositions, mediation, and trial presentations and briefs.

Military Training Facility Project: Assisted the Department of Justice (DOJ) in evaluating an approximately $8.3 million termination for convenience settlement proposal and equitable adjustment claim arising from a $16.7 million design-build military training facility project. Performed a comprehensive delay analysis and review of project records to evaluate 449 days of claimed compensable delay.  Determined that no more than 91 days were attributable to owner-caused impacts.  Identified flaws in the contractor’s delay methodology and quantified critical path impacts involving concrete and structural steel submittals and fabrication, subcontractor performance, corrective floor remediation work, and the termination of subcontractors.  Assisted with preparation of an expert report on schedule delay that contributed to a favorable settlement.

Wastewater Treatment Plant Upgrade Project: Performed a CPM schedule delay analysis supporting delay, wrongful termination, and constructive acceleration claims arising from a $30 million wastewater treatment plant upgrade project. Identified 36 days of excusable, compensable owner-caused delay associated with an owner-directed change and evaluated additional excusable delays involving commissioning specifications and approvals.  Determined entitlement to 183 days of excusable delay to an interim milestone cited as the basis for the contractor’s termination.  Assisted with affirmative and rebuttal expert report on delay and disruption. Supported fact and expert witness depositions.

Luxury Hotel Development Project: Performed a schedule delay analysis in defense of an approximately $14.6 million professional liability and delay claim asserted against the project designer for an 11-story luxury hotel development.  Performed a comprehensive schedule analysis of 463 days of total project delay and evaluated allegations of design-related impacts.  Identified independent and concurrent delay drivers involving owner-directed scope additions, utility conflicts, permitting, owner-furnished material procurement, pandemic impacts, water-damage remediation, and contractor procurement and fabrication delays.  Assisted with the preparation of an affirmative expert report on schedule delay.

Military Airfield Improvements Project: Assisted the Department of Justice (DOJ) in evaluating a contractor’s $1.3 million claim arising from the removal and replacement of non-compliant cement-treated base and associated pavement work for a military airfield improvement project.  Evaluated the claimed damages, identified unsupported and overstated costs, assessed costs that were not recoverable under the contractor’s theories of liability, and analyzed the contractor’s economic waste argument. Determined that the maximum potential recovery, assuming liability, was approximately $433,000.  Assisted with a draft expert report and damages evaluation that contributed to a favorable settlement.

Reservoir Construction Project: Assisted a federal agency in evaluating approximately $20 million in delay, inefficiency, and damages claims arising from a $198 million reservoir construction project.  Performed a comprehensive schedule delay analysis and evaluated approximately 479 days of actual project delay against contemporaneous contract time extensions.  Identified contractor-responsible delays involving concrete test sections, stripping and embankment operations, and the termination of a major earthwork subcontractor.  Evaluated claimed damages emanating from alleged owner-directed sequencing revisions to the construction of a major discharge structure.  Identified and quantified contractor-caused delays to the discharge structure work, and through a review of the project record, established that the sequencing change resulted from the contractor’s failure to comply with contract specifications.