Sophie Lipomanis, PMI-SP, PSP, CCP

Sophie Lipomanis, PMI-SP, PSP, CCP

Senior Associate

Sophie Lipomanis provides claim evaluation and development services for dispute resolution in complex construction disputes. Sophie specializes in CPM scheduling, agile scheduling and hybrid systems, project controls, project management, cost engineering as well as delay and disruption claims analysis. Her work includes claim evaluation, development, and expert review for dispute resolution and litigation matters. Sophie conducts detailed CPM schedule analyses, including critical path and half-step methodologies, and prepares technical graphics to clearly communicate project impacts. She has performed schedule, productivity, and cost quantification analyses on commercial and industrial projects, military bases, highways, wind turbine systems, light rail projects, hospitals, and stadiums.

Sophie has experience providing engineering, scheduling, and cost management services on light rail projects. Her experience includes serving on-site as an engineering liaison, scheduler, and cost engineer; assessing project scopes with subcontractors; reviewing and revising contracts, purchase orders, and letters of intent; and assisting with pricing conceptual scope additions, provisional sum authorizations, and change order directives. She also has experience managing post-design services and conformed drawing modifications to support accurate engineering coordination and successful project delivery.

Education

University of Louisville, B.S., Civil Engineering & Environmental Engineering-Mathematics Minor

Licenses/Credentials

Project Management Institute Scheduling Professional Certification

AACE International, Planning and Scheduling Professional

Certified Construction Control Professional

Oracle Primavera P6 Professional | Global PM Training Certification

OSHA 30 Certification

Professional Affiliations

American Society of Civil Engineers (ASCE), 2024 New Face of Civil Engineering

National Society of Professional Engineers (NSPE)

Society of American Military Engineers (SAME)

Association for the Advancement of Cost Engineering International (AACE)

Select Speaking Engagements

Dream Big Production, Women in Engineering, Dream Team Panelist

Engineering our Future Podcast, National ASCE Ambassador

Plot Points, Women in Engineering

Bruit Arab University, Success as an Engineer in Industry

Workshop for Student Chapter Leaders Guest Panelist

Running is Engineering, ASCE YMG Guest Speaker

“Ghost Schedules 101: What are they? Why are they used? What is the Risk?”AACE Regional Conference February 2025.

Project Highlights

Light Rail Extension Project – Prepared schedule updates during the construction of a $780 million 3.4-mile light rail Design-Build project in Washington State. This project included a parking garage and two aerial structures. Coordinated with various subcontractors to implement appropriate updates in monthly narratives. Analyzed and prepared time impact analysis throughout the project. Managed post design service changes throughout the project as the Engineering quality liaison for thousands of drawing changes. Working closely with field personnel, designers and the owner to implement actualized construction conditions into IFC packages.  Aided the project engineer and management team by packaging additional cost changes and working with the owner throughout the approval process. Prepared and analyzed labor production reports and spearheaded equipment utilization efforts.

Airport Renovation Project – Performed schedule delay analysis on behalf of one of the parties to a $5 billion public-private partnership (PPP) for finance, design, construction, operation, and maintenance for an airport terminal renovation. Reviewed CPM schedules and performed schedule delay analyses for all the different milestones with liquidated damages attached, including overall completion. Issues evaluated included design changes, material substitution, the authority having jurisdiction review and approval of the design, and delays to construction. The construction entity made claims of over $100 million to design professionals for scope changes, design errors and omissions, and associated delay and damages. Created graphical representations of delay for mediation presentation.

Terminal Renovation Project  –  $400 million renovation project. Provided 3-week lookahead services coordinating with numerous subcontractors to consolidate information into uniform formatting for our client. Provided claim assistance and analyzed impacted areas of the project notably causing delay due to inefficient work sequencing.